Electronic bids will be received for the McKinley Park Trails Rehabilitation Project on or before

Thursday, May 29, 2025 at 4:00 PM ET

The project will rehabilitate approximately 1.3 miles of existing native soil trails. Work includes but is not limited to: Erosion and sediment controls; clearing deadfalls, select tree pruning along trail corridors; regrading, resurfacing, and restoring existing trail tread, installation of drainage dips, check dams and other drain features; installation of treated lumber box steps; installation of treated lumber culvert crossings, and other work as defined on the contract documents.

A virtual pre-bid conference will be held via Zoom on Tuesday, May 13th at 2pm. Interested parties must submit a request for the meeting invitation and link to Brandon Riley ([email protected]) by no later than Tuesday, May 13th at 1 pm.

For more info, download the Invitation to Bid